Pakistan
Petroleum Ltd. The PPL LPG / NGL processing plant has a capacity to produce 65-85 MTPD of LPG, 3000bpd of NGL and 23,600 m3 / hr of Natural Gas. Scope of work consisted of complete Erection / Installation of process Equipment which includes Splitter Column, Expander Separator, De- Ethanizer Column, Expander Suction Drum, Refrigeration Until, Fin Fan Coolers and other related equipment. Fabrication / erection of sheet structure weighing 200 tons. Skid Piping 10,000 of Dia inch, Plant Piping of 15,000 Dia inch and Erection / Installation of 900 M3 LPG sphere (The first ‘U’ stamped sphere in the country). Sandblasting and painting of piping structure and sphere of 14000 meter sq. NDE and Hydro testing was done for all piping systems. Maintenance
Services Annual Turn Around (2003) The scope of work included Mechanical and Chemical cleaning of Boilers, Heat Exchangers of U tube and fixed tube type. Mechanical cleaning of vessels and columns, alignments of pumps, overhauling of MV & LV motors, Calibration and maintenance of switchgear and maintenance of pressure safety valves. |
|||||
INSTALLATION
OF FIN AIR COOLER (24TONS) AT ORIENT PETROLEUM AT TANDO ADAM, PAKISTAN. |
INSTALLATION
& ERECTION ACTIVITY AT OPI (NAIMAT BASAL ETF PROJECT) |
||||
ERECTED
FIRST U STAMP LPG SPHERE IN PAKISTAN FOR PPL ADHI LPG & NGL PROJECT |
PRESSURE
VESSELS FOR PPL ADHI LPG & NGL PROJECT |
||||
|
|||||
MV MOTOR 700 H.P., FIXING OF
MV MOTOR ROTOR |
O/H, CLEANING
& TIGHTENING OF LV SWITCHGEAR |