Oil & Gas Process Equipment | |||
1.
|
Ranhill Engineering & Construction Co. | Supply of U-Stamped Pressure Vessels for Pakistan Petrolum Limited LPG/NGL Plant Phase II | |
2. |
M/s. Petronas Carigali (Pakistan) Limited | Design, Manufacturing Supply of Fabrication Seal System Nitrogen Recovery Vessel No. F1-335. | |
3.
|
M/S Pakistan PTA Limited. |
Design, Manufacturing Supply of Fabrication Seal System Nitrogen Recovery Vessel No. F1-335.
|
|
4.
|
M/S Oil & Gas | Supply of Three Phase Separator and recommended Spare Parts. | |
Smoke Tube Fired Boiler | |||
1.
|
Edible Oil Co. Dubai – U.A.E. |
Manufacturing, Supply & Commissioning of 31 TPH @ 12 Bars (g) Pressure Smoke Tube Package Type Steam Boiler
|
|
2.
|
Siemens Pakistan Ltd. Karachi. | Manufacturing Supply & Commissioning of 16 TPH @ 10 Bars (g) Pressure Smoke Tube Package Type Steam Boiler. | |
3.
|
Mapak Edible Oile Ltd. Karachi | Manufacturing Supply & Commissioning of 5 TPH @ 17 Bars (g) Pressure Smoke Tube Package Type Steam Boiler | |
4.
|
Nishat Chunian Ltd., Lahore | Manufacturing, Supply & Commissioning of 10 TPH @ 10 Bars (g) Pressure Smoke Tube Package Type Steam Boilers | |
5.
|
Chenab Limited, Faisalabad. | Manufacturing, Supply & Commissioning of 20 TPH @ 10 Bars (g) Pressure Smoke Tube Package Type Steam Boiler Two (2) Nos. | |
Waste Heat Recovery Boiler | |||
1.
|
Chenab Limited, Faisalabad. |
Manufacturing Supply & Commissioning of 2.4 TPH @ 10 Bars (g) Pressure Triplex Waste Heat Recovery Boiler for Jenbacher JGS 320.C 03 Nos. Gas Engines | |
2. |
Sitara Chemical Industrial Limited. Faisalabad. | Manufacturing Supply & Commissioning of four (4) nos of 3.75 TPH @ 16 (g) Pressure Duplex Waste Heat Recovery Boiler for Jenbacher JGS 320 C. 02 Nos. Gas Engines | |
3.
|
Ittehad Chemicals Limited, Lahore |
Manufacturing, Supply & Commissioning of five (5) nos. of 4,450 Kg/Hr. @ 15 Bars (g) pressure Waste Heat Recovery Boilers coupled with 1 No. WARTSILA Gas Engine (Model 18V34SG) | |
4.
|
ICI Pakistan Ltd., Lahore | Manufacturing, Supply & Commissioning of 20 TPH @ 10 Bars (g) Pressure Waste Heat Recovery Boiler coupled with 5.25 MWe (TYPHOON) Gas Turbine Complete with Supplementary Gas Firing & Ancillary equipment. | |
Waste Water Treatment Plants
|
|||
1.
|
M/S BHP Billiton Petroleum Pvt., Limited. | Design, Supply, Installation and commissioning of PH Adjustment of Waste Water (40M3/Hr capacity). | |
2. |
M/S Habib Gulzar (Afghanistan) | Waste Water Treatment Plant @ 40 M3/Hr Capacity | |
Others | |||
1.
|
Sheraton Hotel Karachi | Design, Manufacturing, Supply and commissioning of Hot Water Generator (786 GPM) for Carrier Chiller | |
2.
|
Century Paper & Board Mills | DESIGN ,FAB OF DE- DUSTER UNIT | |
3. |
Shakarganj Mills Limited | Fabrication & Supply Of Distillery Equipment. | |
4.
|
Packages Limited |
Manufacturing, Supply Of Digester Tube Pl-6516 | |
Exports | |||
1.
|
Habib Gulzar Non Alcoholic Beverages Limited, Kabul, Afghanistan |
Design, Manufacturing, Supply, Installation and Commissioning of 5TPH @ 10 Bars (g) Smoke Tube Fired Boiler
|
|
2. |
Habib Gulzar Non Alcoholic Beverages Limited, Kabul, Afghanistan |
Design, Manufacturing, and Supply of Stainless Steel Syrup Storage Tanks |
|
3. |
Habib Gulzar Non Alcoholic Beverages Limited, Kabul, Afghanistan |
Design, Supply, Installation and Commissioning of Waste Water Treatment Plant (40 M³/Hr ) excluding Civil Structural Design & Construction |
|
4.
|
Edible Oil Company |
Design, Manufacturing, Supply & Commissioning of 31TPH steam boiler @ 12 Bars (g) Smoke Tube Twin Furnace Fired Boiler
|
|
5.
|
Water Garden Hotel, Dhaka, Bangladesh |
Detailed Design, Technical Supervision & Support & Commissioning of Sewage Treatment Plant (8.5 M³/Hr )
|